logo
 

Musi project gate lifted in Nalgonda

Mon 18 Sep 2017, 13:55:09
A gate of Musi river was lifted on Monday morning as a precautionary step after the water level touched the maximum storage level due to increasing inflow.The water level in the Musi project reached to 644.60 feet against the maximum level of 645 feet, said the officials of Irrigation Department who decided to lift the gate.

Nakrekal MLA Vemula



Veeresham pressed the control board’s switch to lift a gate of Musi project at 11 am.With this 1,300 cusecs of water was released to downstream by lifting the gate up to 2 feet.

The gate would further be lifted up by one feet, if the inflow to the project increases. Presently, the inflow to Musi project was 1,800 cusecs.


No Comments For This Post, Be first to write a Comment.
Leave a Comment
Name:
Email:
Comment:
Enter the code shown:


Can't read the image? click here to refresh
etemaad live tv watch now

Todays Epaper

English Weekly

neerus indian ethnic wear
Latest Urdu News

Do you think AAP will perform better in Delhi polls without alliance?

Yes
No
Can't Say