logo
 
In Jammu and Kashmir, the final trial run on the Katra-Budgam railway track of Udhampur-Srinagar-Baramulla Rail Link (USBRL) was completed yesterday as the 18-coach trial train started at 8 AM from Katra railway station towards Kashmir. The trial train has reached Budgam and this completes the final trial run on the USBRL. The ambitious Udhampur-Srinagar-Baramulla Rail Link has been completed for 41 thousand crore rupees. The track covers 326 Km out of which 111 Km section is in tunnels with the T-49 tunnel being 12.77 Km long, which is the longest railway tunnel in the country. 

The Indian Railways has made the



world’s highest railway bridge over the Chenab River in the Reasi district which is 1315 meters long having an arch span of 467 meters and a height of 359 meters above the river bed. It is built between the Sangaldan Railway Station and the Reasi Railway Station. Indian Railways has also built its first cable-stayed bridge over the Anji Khad river. 

The project will boost the horticulture, agriculture, tourism, trade, and education of students and also make travel easy and affordable for the average citizen between Kashmir and the rest of the country.




No Comments For This Post, Be first to write a Comment.
Leave a Comment
Name:
Email:
Comment:
Enter the code shown:


Can't read the image? click here to refresh
etemaad live tv watch now

Todays Epaper

English Weekly

neerus indian ethnic wear
Latest Urdu News

Which political party will win the Delhi Assembly polls to be held on Feb 5?

Aam Aadmi Party
Congress
BJP