logo
 
New Delhi: India's second home-built 700 MW nuclear power reactor at Kakrapar Atomic Power Station (KAPS) in Gujarat on Wednesday started operating at its full capacity, the plant operator said.

The Nuclear Power Corporation of India Limited (NPCIL) said Unit 4 at KAPS had been operating at 90 per cent capacity



before raising it to full power of 700 MWe.

"The full power operation of KAPS-4 after the smooth operation of its twin unit KAPS-3 at full power demonstrates the strength of the first of a kind indigenous 700 MW Pressurised Heavy Water Reactor (PHWR) design," the NPCIL said.



No Comments For This Post, Be first to write a Comment.
Leave a Comment
Name:
Email:
Comment:
Enter the code shown:


Can't read the image? click here to refresh
etemaad live tv watch now

Todays Epaper

English Weekly

neerus indian ethnic wear
Latest Urdu News

Which political party will win the Jharkhand Assembly elections 2024?

Congress
Jharkhand Mukti Morcha
BJP