The Railways is planning to cover its entire network of 68,000 route km with automatic train protection system in a phased manner.
Addressing the 62nd annual day of Indian Railways Institute of Signal Engineering and Telecommunication in Hyderabad
Railway Board Chairman Vinod Kumar Yadav said as a pilot project, the system would be implemented on 650 route km of the golden quadrilateral corridor connecting the four metros - Delhi, Mumbai, Chennai and Kolkata.